Sports Flooring & Architectural Coatings Solution Manufacturer

Home / All / About Plastic Track /

How long is the construction period of a plastic track?

How long is the construction period of a plastic track?

Update Time:2025/1/11

Each type of plastic track is laid on site, and there are many external factors such as area, temperature, rainy season and dry season. The construction period varies greatly according to the on-site conditions. Specific projects need to be calculated specifically, and an accurate construction period cannot be provided.

Please send your message to us
*Email
*Name
*Tel
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.
Address